I work at DTE Energy in Detroit and we have an application running on PowerBuilder 7 with Oracle 8.0.6 as the database. Can we convert the database to Oracle 11? Will the application still work or do we have to upgrade to a newer version of PowerBuilder.
Thanks
Mike St. Onge